Tricks Install Floor Tile

The technique to installing floor tile is start laying the floor from the center of the room. The measure of the room should be done exactly and the any irregularities ignored. The center location on the floor has to be marked accurately using a chalk line. Lines should be drawn across the length and breadth of the room and the place where the lines intersect is the center. Recheck the accuracy of the center position as it is very important for quality floor tile installation.

The second step is to lay loose tile from the centre along the marked chalk lines. After laying the loose tiles, measure the distance of the last tile from the wall. This will give you an idea of the size of the last tile that needs to be placed to finish the row. Once you have an idea by placing the loose tiles you can have an idea of the number of tiles required to complete the entire room.

The third step is to place different color tiles at different locations as per your choice. Open the boxes and place the tiles at the accurate places on the floor. Now, start applying the adhesives on one fourth of the floor area and wait for sometime. It generally takes about 10-15 minutes for the adhesive to dry before you can start installing floor tiles. However, the time may depend on the temperature and humidity.

Start placing the tiles along lines starting from the center of the floor. Remember, placing the first tile correctly as it is very important and determine the finish. Place each tile firmly on the ground and also against another tile. This will ensure a quality finish. The border tile should be cut accurately to give a perfect finishing to the room. When fitting a tile along a pipe or any other obstruction, simply cut the tile into that shape so that it fits exactly into that position. Do not wash the tiles at least one week after installing floor tile.